ERC was contracted by Summit County to complete a design/build restoration for an approximately one mile reach of the Upper Swan River. The Upper Swan River project area, a major tributary to the Blue River, had been historically mined using dredging techniques leaving the stream below ground and the valley devoid of natural vegetation and ecological function. ERC’s task was to recreate the stream, riparian, and upland areas in a natural manner to replicate pre-mining activities. Work included creation of a meandering valley river and restoration of approximately 29 acres of riparian and upland habitat. ERC worked closely with project sponsors including Summit County, the Town of Breckenridge, and the Forest Service to define appropriate hydrology, channel morphology, bankfull channel widths, channel planform, substrate liner material, rock sizing, a new aquatic organism passage bridge and stream profile as well as riparian and upland restoration techniques. The plan employed natural channel design including riffle-pool-glide sequences and establishment of native vegetation communities. This complex restoration project illustrates our team’s abilities to incorporate the full gamut of technical, permitting and construction complexities of a large-scale multi-objective restoration project.

PROJECT
Swan River